Snow load

The St. Anthony snow load is 50 PSF

Fremont County Ordinance 2014-02 sets 50 PSF for the South Fremont district, which takes in St. Anthony — the lowest of the four figures the ordinance sets. The county assigns each parcel its district on its Snow Load Zone Map, and your engineer designs to the figure the county assigns.

Published · Updated · every figure below was checked against its primary source on the date shown.

The county names it in one sentence

Fremont County splits into snow-load districts, and each one carries its own design figure. St. Anthony's is the lowest of them.

“Section 3. Ground Snow Load: The ground snow load shall be: … 50SF. See Fremont County Snow Load Map.”

— Fremont County Ordinance No. 2014-02, Section 3, kept in force by Ordinance No. 2021-02, Section 5 (county-published PDFs, retrieved 13 November 2026). “SF” is the South Fremont zone on the county's Snow Load Zone Map.

The ordinance is a scanned document rather than a modern PDF, which is part of why the figure circulates so poorly — its only text is a machine-read layer that scrambles the word order in places, and the older Ordinance 2005-02, which called this the St. Anthony District, is still posted on the county's site even though Ordinance 2008-01 repealed it in its entirety. The text above was read from the county's own published file on 13 November 2026.

The county assigns the district, not the address

The ordinance does not model each town separately. It sets one figure for each broad district — elevation and exposure are the reasons a single number can cover a whole stretch of country — and it hands the question of which district a parcel belongs to over to the county's map.

The two county documents that put a snow-load figure on St. Anthony's zone. Ground figure from Ordinance 2014-02 §3, kept in force by Ordinance 2021-02 §5; zone label from the county's Snow Load Zone Map.
SourceWhat it isFigure for St. Anthony's zone
Fremont County Ordinance 2014-02 §3The adopted regulation — a ground snow load and a code minimum50 PSF
Fremont County Snow Load Zone MapThe county's roof-load map, which assigns each parcel its zone“South Fremont District 35#”

The practical consequence is a simple one: the county assigns your parcel its district, and your engineer designs to the figure the county assigns. Which district that is comes from Fremont County Planning & Building Department, 125 N Bridge Street, St. Anthony, ID 83445 — (208) 624-4643, not from a mailing address or a contractor's memory.

What the numbers mean, in one line each

  • 50 PSF — the county's adopted figure. A regulation. It is the minimum your design has to satisfy in this district, and a plan reviewer checks against it.
  • “South Fremont District 35#” — the map's label. The county's roof-load map names this zone with that figure, and it is the map that decides which zone a parcel is in.
  • The district comes from the county. Confirm it for the parcel before anyone sizes a truss, and get the figure written on the plan set.

The rule you may fall below, and why to ask about it

The county's own pre-construction checklist carries a sentence that matters a great deal if your lot is in this district. It says that structures built “within a ≥ 70lb/ft² roof snow load” are required to be designed by a structural engineer or an architect licensed in Idaho.

That “≥” means 70 or more, so the sentence is a threshold. The county's own Snow Load Zone Map labels this zone “South Fremont District 35#”, and the ground figure the ordinance sets for it is 50 PSF — below the line either way. On a county parcel in this zone, a mandatory engineer or architect stamp is a real line item to be spared.

Two things can still put a stamp back on your budget, and both are worth one phone call to Fremont County Planning & Building Department, 125 N Bridge Street, St. Anthony, ID 83445 — (208) 624-4643 before you budget for a stamp you may not need — or skip one you do. The zone line follows section lines rather than addresses, so confirm the parcel's zone. And inside the city limits the county sentence does not decide it at all: the city's own application says the submittal documents must be prepared or signed off by a registered design professional.

One caution, because it catches people: there is a separate rule with no snow-load condition attached at all. Free-standing post and beam structures require engineered stamped plans regardless. If what you are building is a post-frame shop or a barndominium, the 50 PSF figure does not get you out of anything.

What 50 PSF does and does not decide

A design snow load is one input among several. What it touches, and what it leaves untouched, on a typical build in this district.
It decidesIt does not decide
Truss and rafter sizing, and the spans you can achieveFoundation depth, which the county fixes countywide
How much roof structure a long clear span costsWhether your ground will take a septic system
Whether drift-prone valleys need extra design attentionWell depth, which nobody knows until it is drilled
Whether the county's engineer-or-architect rule applies — it starts at 70 lb/ft², above this zoneWhether free-standing post and beam needs stamped plans — it does, regardless

What to actually do with the number

  1. Confirm which snow-load district the parcel is in, from the building department rather than from the address.
  2. Ask your designer which figure the plans are drawn to, and get it in writing on the plan set.
  3. If the answer is South Fremont, the county's engineer-or-architect rule — which starts at 70 lb/ft² — does not reach you; get that confirmed by the county, not from a contractor's memory.
  4. If the structure is post and beam, assume you need stamped plans and budget for them.

Related reading on this site

Common questions

What is the ground snow load in St. Anthony, Idaho?

Fremont County Ordinance No. 2014-02, Section 3 — kept in force by Ordinance 2021-02 — sets a 50 PSF ground snow load for the South Fremont zone, the one St. Anthony sits in on the county's Snow Load Zone Map. It is the lowest of the four figures the ordinance sets.

Is 50 PSF the number my engineer will use?

It is the county's code minimum, which is a floor and not a ceiling. An engineer may design above it for a particular roof geometry, a drift condition, or a client who wants margin. Ask which number appears on your plans and why.

Who tells me which snow-load figure applies to my parcel?

The county. Ordinance 2014-02 sets the district figures and points to the county's Snow Load Zone Map, which assigns each parcel to a district. Ask Fremont County's Planning & Building Department, (208) 624-4643, which district your parcel sits in; your engineer then designs to the figure the county assigns.

Does a lower snow load make my house cheaper?

It can reduce framing and truss cost compared with a higher-load district, because the roof structure carries less design load. It does not reduce anything else, and it never reduces the cost of a bad site. Snow load is one line in a bid, not the bid.

Does 50 PSF mean I do not need an engineer?

Not because of snow load, on a county parcel. The county's checklist says structures built “within a ≥ 70lb/ft² roof snow load” must be designed by an Idaho-licensed structural engineer or architect, and its Snow Load Zone Map labels this zone “South Fremont District 35#” — below that line. Two things still require one: free-standing post and beam structures need engineered stamped plans regardless, and inside the city limits the city requires plans prepared or signed off by a registered design professional. Confirm the parcel's zone with the building department.

Does the district boundary follow the city limits?

No, and do not assume it does. The ordinance names the districts and their loads but defines no boundaries in its text; it points to the county's Snow Load Zone Map, which draws the zones along section lines rather than city limits. Ask the building department which district a specific parcel sits in.

Does the snow load change what my roof can look like?

It changes what the structure under it has to be. Long spans, low pitches, valleys that collect drift and heavy roofing materials all interact with the design load. Bring the roof idea to the engineer early rather than after the plans are drawn.

Does the city use the same 50 PSF figure inside the city limits?

The ordinance sets district figures for the county. Inside the St. Anthony city limits the city issues the permit and reviews the plans, so ask the city office directly which design snow load it enforces rather than assuming the county district figure carries across the boundary unchanged.

Ask about a build in St. Anthony

Describe the parcel and roughly what you have in mind. What comes back is an honest read on which firms here take that kind of work, plus the one thing most people have not established yet: whether the city or the county will be reviewing your plans. Free, and nothing automated ever follows.

  1. Say where the ground is and what you intend to put on it.
  2. You are pointed toward the firms in this town with that work behind them.
  3. From there it is between you and them. No commission, no introduction fee, and nobody standing between you and your own contract.

One contact method is plenty — whichever you prefer. A human being writes back.

Not sure which snow-load district your parcel is in?

The ordinance names the districts but the boundary lives on a map. We will tell you exactly what to ask.

Call or text (208) 656-1745