Published
What does Fremont County charge to split land or adjust lot lines near St. Anthony?
The printed county-side figures are small: a $200 surveyor fee plus $20 per lot on a short plat, or $200 plus $25 per lot on an amendment — applications retrieved 7 September 2026. The application fee and your surveyor's plat charge are set by the county fee schedule and the firm, not by these forms.
The printed county-side figures
| Item | Printed figure | Source and date |
|---|---|---|
| Short plat — county surveyor fee | $200, plus $20 per lot | Short plat application under Fremont County Development Code, 2011 Edition (Ordinance 2011-04), section 3.16, consolidated through Ordinance 2026-03 — retrieved 7 September 2026 |
| Plat amendment — county surveyor fee | $200, plus $25 per lot | County amendment application, Appendix L standard — retrieved 7 September 2026 |
| Sketch plat copies | 1 copy — single lot · 3 copies — short plat · 15 copies — subdivision | Short plat application materials — retrieved 7 September 2026 |
| Amendment drawings | Proposed division, structures and all property lines, with two copies of final plat Mylars for recording | Appendix L standard — retrieved 7 September 2026 |
| Amendment attachments | A parcel map available from the Assessor's office, and a warranty deed or evidence of the current owner | Amendment application — retrieved 7 September 2026 |
| Full subdivision final package | Sixteen or more copies of the final plan package plus one reproducible original | Our final-plat page's checklist (published 2026-09-09) |
| Agency letters, as applicable | Eastern Idaho Health District, the Fremont-Madison Irrigation District, the Fire District and the U.S. Fish and Wildlife Service | Short plat checklist — retrieved 7 September 2026 |
Every row above is printed exactly as its source prints it. The short plat's procedure — who decides, notice, and the one-year clock — is laid out on splitting land into six lots or fewer; this page gathers only the county-side charges and paperwork costs.
The two charges that are not on any form
- The application fee itself. "The application fee itself is set by the county's fee schedule" — and the fee schedule is not among the documents we banked. It is a phone call, not a guess.
- Your own surveyor's plat charge. The banked page says it plainly: "your own surveyor's plat charge — the real number in any split — is set by that firm; both belong in the budget before the first drawing." Price the survey before the first drawing, not after.
What moves the number
- Irrigated ground, two very different costs. "Anyone contemplating splitting inherited ground should establish which route they are on before doing anything else, because the two have entirely different costs. Transferring or excluding water rights is a legal process. Delivering water to every lot is a construction budget." The water-rights routes are explained on the agricultural nuisance waiver page.
- The path itself. Copies scale with the route — one sketch plat copy for a single lot, three for a short plat, fifteen for a subdivision, sixteen or more for a final plan package.
- Agency letters, where they apply. The checklist names Eastern Idaho Health District, the Fremont-Madison Irrigation District, the Fire District and the U.S. Fish and Wildlife Service "as applicable" — not for every application, but not predictable in advance either.
- The wrong drawing. "A minor amendment adjusts what exists; the moment a genuinely new parcel appears, the application is not minor anymore. Confirm which one you are filing at (208) 624-4643 before the surveyor bills for the wrong drawing."
How to get a real number
Confirm which path you are filing at the Planning and Building Department, 125 N. Bridge St. Suite 1, St. Anthony — (208) 624-4643 (the desk as printed on the county's own agenda contact block). Then price the plat with the surveying firm — that quote, plus the county fee schedule's application fee, is the real budget. For weighing a split against a build plan, call our research line at (208) 656-1745. The amendment path on its own is on amending a recorded plat; the full subdivision package is on what goes on a final plat.
What we could not price
Named gaps in the banked documents — named, not filled:
- The county application fee for a short plat, a plat amendment or a full subdivision — set by the county fee schedule, which no page we banked prints.
- The private surveyor's charge for drawing the plat — set by the firm.
- Recording fees at the county recorder — not banked.
- What a water-rights transfer or an irrigation delivery system costs — not banked.
- Engineering plans, where the county asks for them — no cost banked.
Frequently asked questions
How much is the county application fee for a short plat or an amendment?
Not printed in any document we banked — it is set by the county's fee schedule. Confirm at the Planning and Building Department, (208) 624-4643.
What does the surveyor cost?
Set by the surveying firm, not the county. The banked page calls the surveyor's plat charge "the real number in any split" — price it before the first drawing.
What is the difference between the short plat and amendment fees?
Both print a $200 county surveyor fee; the per-lot adder differs — $20 per lot on a short plat, $25 per lot on a plat amendment (retrieved 7 September 2026).
How many copies do I need?
One sketch plat copy for a single lot, three for a short plat, fifteen for a subdivision. An amendment needs two copies of final plat Mylars for recording; a full subdivision final package runs sixteen or more copies plus one reproducible original.
What are the recording fees at the county recorder?
Not banked. Confirm with the recorder's office before recording.
Does irrigated ground change the cost?
Yes, and by more than the application fees: transferring or excluding water rights is a legal process; delivering water to every lot is a construction budget — the banked page calls these "entirely different costs."
Which path should I file — short plat or amendment?
Confirm before paying for drawings: "the moment a genuinely new parcel appears, the application is not minor anymore." The desk to confirm at is (208) 624-4643.
Do I need agency letters?
The checklist names them as applicable — Eastern Idaho Health District, the Fremont-Madison Irrigation District, the Fire District and the U.S. Fish and Wildlife Service — rather than for every application.