Cheapest way to build a house
This page answers the method, not the amount. The cheapest builds here pick the right type first — the barndominium and shop-house lanes — keep a simple footprint, as a general rule, and respect what the low-budget lanes legally are: an agricultural building is not a house. Dollar amounts for this market live on the custom-home cost page, linked below.
Can you build a house for $20,000 in Idaho?
Not a house you may lawfully live in, on anything this site has banked. The lane a $20,000 budget actually reaches in Fremont County is the agricultural building — a genuinely cheap path with a hard limit: it is not a dwelling, and the exemption carries its own rules (the agricultural building exemption).
And the tax code polices the boundary between a cheap structure and a residence. Idaho's occupancy statute counts as first occupancy: "Use of the property by any person as a residence including occupancy of improvements or use in storage of vehicles, boats or household goods, provided such use is not solely related to construction or sale" (Idaho Code §63-317(2)(a); retrieved 21 October 2026). Store the boat in the "shop" and the occupancy clock can start.
This site banks no $20,000 build figure, and a budget-tier square footage figure is not banked either — both are listed under needs-sources below. The amount answer for this market lives at what a custom home costs here.
The cheapest type of house to build
Three lanes compete for "cheapest" in this market, and each has a page of its own:
- Barndominium — metal shell, open interior; the county requirements are on the barndominium page.
- Shop house — the shop-first cousin; the type choice is walked at shop house or barndominium.
- The ag-exempt building — cheapest of all, and not a house (agricultural building exemption).
As a general rule — not a banked local figure — a simpler shape, one living level, and an unfinished-later shell are what shave a build budget; the site prints no per-type cost range because none is banked (needs sources, below).
The cheapest foundation for a house
Honest gap: this site has banked no foundation cost figure and no foundation-type comparison for this valley — no slab-versus-crawlspace-versus-basement range with a source and a date, so none is printed here.
What can be said without inventing numbers, as general rules: foundation cost follows excavation depth and concrete volume, and both follow the site — ground, slope, and access for the crews. Which foundation a lot can take is a question your designer answers against the soils, and the plans carry the engineering (who can design your house). When a banked local figure family exists, it belongs on the cost page, which carries this site's labeled public fees.
The best month to build a house in the St. Anthony valley
No single month is banked as "best," and this site will not invent a season. What the banked clocks actually say:
- Review alone takes four to six weeks — the county packet "wants a complete application with the parcel, section, township and range, a deposit on submittal, a $50 site plan review fee, two sets of plans with engineering calculations and truss designs, and roughly four to six weeks to review" (stanthonyhomebuilders.com/zoning-permit-comes-first, published 22 August 2026).
- Septic evaluations need ground you can dig. "…evaluations need ground you can actually dig and read, which narrows the window in a valley with real winters… a slow evaluation delays your entire building permit, so start it earlier than feels necessary." (stanthonyhomebuilders.com/city-water-sewer-or-well-septic, published 20 August 2026.)
- The design constant never moves. Whatever month you pour, the structure answers to the district's ground snow load — the figure and its ordinance cite live on the snow load page.
Read together: work backward from the season you want frames standing, file the permit packet before it, and run the septic evaluation before the ground is frozen or saturated. Probability and preparation, not a deadline scare.
How big of a house can you build on a 10,000-square-foot lot?
The answer is arithmetic your zoning district does for you: lot size minus the setbacks the district imposes on each side, further capped by any lot coverage limit. The catch in this market is that two different setback lists exist — one for inside the St. Anthony city limits, one for the county — and the city's permit form carries its own list. The site's two setback lists, one form page is where those numbers live; they are deliberately not restated here. Get the list that matches your desk — city limits or county — before you fall in love with a floor plan.
Is 0.23 acres big enough to build a house?
0.23 acres is just over 10,000 square feet — so the two questions above are really one question. What decides it:
- The zone's minimum lot size, where one applies — not banked on this site; the county Planning and Building desk answers it for a specific parcel (125 N. Bridge St., St. Anthony; (208) 624-4643, as printed on the county P&Z docket contact block).
- How the parcel was created. A parcel that came off a recorded plat carries what the plat gave it; the county's small-division path is the short plat, which "permits a division of land into six (6) or fewer lots (including the reconfigured original source parcel of land), and is an administratively processed Class II permit" (Fremont County Development Code, 2011 Edition, section 3.16; consolidated through Ordinance 2026-03; retrieved 7 September 2026) — see splitting land, six lots or fewer.
- Setbacks and coverage, as above.
What this page does not have yet (needs sources): per-method square-foot build ranges and budget-tier square footages (market sources, current year); foundation-type cost kinds; setback and lot-coverage numbers from the city form and the county code (they live on the setback page — this page links, not reprints).
Questions people also ask
Can you legally live in an agricultural building in Fremont County? No — the agricultural exemption covers a building that is not a dwelling; the exemption page states the lane's rules.
Does storing a boat or furniture in a new building start the occupancy tax? It can: "use in storage of vehicles, boats or household goods" counts as occupancy "provided such use is not solely related to construction or sale" (Idaho Code §63-317(2)(a), retrieved 21 October 2026).
What is the cheapest type of house to build here? The barndominium and shop-house lanes are this market's budget lanes; the type choice is walked at shop house or barndominium. No per-type cost range is banked.
Is a barndominium permitted in Fremont County? The county requirements are banked on the barndominium page.
How long does the county take to review a building permit? Roughly four to six weeks, per the banked county packet description.
What fee does the county charge at submittal? A $50 site plan review fee plus a deposit on submittal; the deposit amount is not banked. Inside the city, the labeled public figures are the $150 city deposit and the $50 review lane (custom-home-cost page).
When should the septic evaluation happen? Before filing anything with the county — and earlier than feels necessary, because evaluations need diggable ground and a slow one delays the whole permit.
Is there one best month to start a build in the valley? No single month is banked. The banked clocks say: four to six weeks of review, plus a septic evaluation that needs ground you can dig.
Build to a budget you can verify: call or text (208) 656-1745, or send the written question form on stanthonyhomebuilders.com. By Kjel Jones — independent custom-home researcher for St. Anthony and the Fremont County valley floor. Not a builder and not a general contractor. Licensed Idaho real estate agent, LPT Realty.